Skip to content
credits rolled
Sign in
Ground Force poster

Brotherton

S8 E6Feb 18, 200230m

In the last episode of the series, the team are challenged to revamp a plot at Lyndale Residential Caravan Site. They set about building a veranda and creating a water feature using copper piping, but the terrible weather and poor soil make progress very difficult leaving them staring defeat in the face.

Reviews

No reviews yet.