Skip to content
credits rolled
Sign in
Season 8

Season 8

199726 episodes

Episodes

  1. 1. Craftsman Bungalow: Project Introduction

    Sep 1, 1997

    A vintage Sears kit house is restored, but historic and sentimental elements are preserved.

  2. 2. Craftsman Bungalow: Wiring, Plumbing and Plastering

    Sep 8, 1997

    A closet is transformed into a bathroom, while new and old building materials are blended in the living and dining rooms.

  3. 3. Craftsman Bungalow: Reconditioning the Windows

    Sep 15, 1997

    Bob Vila oversees the reconditioning of an original window in the Sears kit house. Also: a tour of Frank Lloyd Wright's Hollyhock House.

  4. 4. Craftsman Bungalow: Interior Trim and Porch Framing

    Sep 22, 1997

    Interior trim details are custom-milled as per the architect's specifications, and original bathroom fixtures are re-porcelainized. Also: framing continues on the back porch.

  5. 5. Craftsman Bungalow: Repairing the Front Facade

    Sep 29, 1997

    Vintage cabinetry is discovered in a salvage yard and installed in the kitchen; yellow paint is stripped off; and the facade is given a facelift.

  6. 6. Craftsman Bungalow: Swimming Pool and Porch

    Oct 6, 1997

    The pool crew finishes the rebar and sprays gunnite, while French doors are installed in the master bedroom and the porch roof is repaired.

  7. 7. Craftsman Bungalow: Working On the Pool

    Oct 13, 1997

    Green Indian slate is installed on the surround and porch steps. Also: the backyard entry gate is finished.

  8. 8. Craftsman Bungalow: Exterior Paint Preparation

    Oct 20, 1997

    At the Sears kit house, the exterior is stripped for priming and painting. Also: a tour of the CBS studio center.

  9. 9. Craftsman Bungalow: Floor Tile and Cabinet Installation

    Oct 27, 1997

    The bathroom is tiled, new kitchen cabinets are custom-made to match the vintage ones, and decking is installed on the back porch.

  10. 10. Craftsman Bungalow: Installing Custom Light Grids

    Nov 3, 1997

    The electrician installs back lighting in the living room, and six stained-glass panels are cut and assembled. Meanwhile, contractors insulate the roof.

  11. 11. Craftsman Bungalow: Installing Cabinets

    Nov 10, 1997

    A cabinetmaker frames boxes for living-room built-ins to match existing ones in the kitchen, and the pool crew finishes the plaster.

  12. 12. Craftsman Bungalow: Hardwood Floor Repair and Refinishing

    Nov 17, 1997

    Damaged hardwood flooring is repaired and an alder kitchen countertop is installed. Also: a tour of the Japanese Garden at Huntington Library and tips on building a Zen garden.

  13. 13. Craftsman Bungalow: House Tour

    Nov 24, 1997

    Bob Vila leads a final tour of the landscaped front yard and the porch addition, which features a barbecue. Also toured are the Zen garden and swimming pool.

  14. 14. Dream Garage: Project Introduction

    Dec 1, 1997

    Plans for a post-and-beam garage and boat storage project are discussed with an architect. Also: touring a marina with America's Cup champ Bill Koch.

  15. 15. Dream Garage: Working On the Foundation

    Dec 8, 1997

    Foundation work is begun, while Bob Vila tours an antique car museum in a Shaker-style round barn in Sandwich, MA.

  16. 16. Dream Garage: More Foundation Work

    Dec 15, 1997

    As the foundation is prepared, Bob Vila explains termite-proofing and oversees the installation of a hydronic heating system.

  17. 17. Dream Garage: Framing the Garage

    Dec 22, 1997

    A look at framing, and the special techniques and tools that are used for it. Also: a tour of a lumber company examines pre-cut materials for the post-and-beam plan.

  18. 18. Dream Garage: Framing and Decking

    Dec 29, 1997

    New decking is installed in the loft, while Bob Vila and the crew put up the ridge beam and rafters. Also: a joinery specialist demonstrates house framing.

  19. 19. Dream Garage: Insulating the Garage

    Jan 5, 1998

    Insulation panels are installed and Bob Vila visits a factory where all-in-one wall product is made.

  20. 20. Dream Garage: Exterior Trim and Siding

    Jan 12, 1998

    Windows, exterior trim and siding are installed. Also: a tour of the American Plywood Association lab, where quality testing is observed.

  21. 21. Dream Garage: Skylights and Metal Roofing

    Jan 19, 1998

    Metal roofing is installed and drywall is put up around the skylights.

  22. 22. Dream Garage: Installing Protective Features

    Jan 26, 1998

    Bob Vila takes a look at such safety features as motion detectors, a fire-suppression unit and a lightning rod.

  23. 23. Dream Garage: Installing a Staircase and Paneling

    Feb 2, 1998

    A horticulturalist shares general landscaping tips and offers special advice on the use of native plants and trees. Also: building a staircase to the loft.

  24. 24. Dream Garage: Heating and Lighting

    Feb 9, 1998

    A garage-door opener is installed, the heated-floor system is activated, and interior paneling is stained. Also: track lighting goes in.

  25. 25. Dream Garage: Setting up the Workshop and Garage

    Feb 16, 1998

    The interior of the barn is stained and a workshop is assembled. Also: race-car driver Lyn St. James helps Bob Vila set up the automotive garage with new tools.

  26. 26. Dream Garage: Barn Tour

    Feb 23, 1998

    Workbenches are completed and metal shelves are installed in the loft, before Bob Vila leads a tour of the finished barn.

Reviews

No reviews yet.