

Arlington 2014: Part 6: Additional Details
S35 E14Feb 8, 2014
The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.
Reviews
No reviews yet.