

Lexington: Reworked and Rewired
S45 E6Nov 2, 202327m
The fully framed front of the house is revealed; work continues on the geothermal system; the connection to the interior is made; blocking is installed in the framing; replacing and rewiring old receptacles.
Reviews
No reviews yet.