Skip to content
credits rolled
Sign in
Season 23

Season 23

200926 episodes13h in all

Episodes

  1. 1. Digging Out the Yard

    Feb 7, 2009 · 30m

    The Hometime crew re-grades a sloping back yard, installs a drainage system, and begins building a series of paver patios.

  2. 2. Urban Terraces

    Feb 14, 2009 · 30m

    The Hometime crew weaves several retaining walls, steps, and patios into a small, sloped back yard.

  3. 3. Caretaker's Home

    Feb 21, 2009 · 30m

    The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.

  4. 4. Entrance Plaza

    Mar 7, 2009 · 30m

    The Hometime crew renovates a church courtyard with a textured concrete walkway, custom wood benches, and a raised planting bed.

  5. 5. Betsy-Tacy Home: Decoration

    Apr 4, 2009 · 30m

    The Hometime crew makes its last visit to this historic home to create a sidewalk outside and to finish painting and wallpapering the interior.

  6. 6. Eat-In-Kitchen: Demolition

    Apr 11, 2009 · 30m

    The Hometime crew takes a small kitchen and starts work to improve storage and functionality.

  7. 7. Eat-In-Kitchen: Cabinets

    Apr 18, 2009 · 30m

    The Hometime crew installs new kitchen cabinets, a new sliding door and new floor tile.

  8. 8. Eat-In-Kitchen: Wrap Up

    Apr 25, 2009 · 30m

    The Hometime crew installs countertops and appliances, as well as a new wood floor for the adjacent living room.

  9. 9. Sculpture Studio: Framing

    May 2, 2009 · 30m

    The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door.

  10. 10. Sculpture Studio: Finishing

    May 9, 2009 · 30m

    The Hometime crew wraps up the workshop with doors, windows and welding equipment.

  11. 11. Great Room Hardwood Floor

    Sep 5, 2009 · 30m

    The Hometime crew installs a super-hard, prefinished wood floor.

  12. 12. Travertine Floor

    Sep 12, 2009 · 30m

    The Hometime crew installs large-format limestone flooring.

  13. 13. Seven-Year Plan

    Sep 19, 2009 · 30m

    The Hometime crew works with a designer to identify and prioritize a house-wide makeover. Then they begin with the first phase: tearing apart the living room and dining room.

  14. 14. Kitchen Facelift

    Sep 26, 2009 · 30m

    The Hometime crew transforms a kitchen with re-faced cabinets along with new counters, tile, appliances and lighting.

  15. 15. Great Room Update

    Oct 3, 2009 · 30m

    The Hometime crew uses new trim, wood flooring, lighting, paint and furniture to transform a dated, 1970s living room and dining room.

  16. 16. Linoleum Flooring

    Oct 10, 2009 · 30m

    The Hometime crew installs sheet and tile linoleum on the Hometime log cabin basement floor.

  17. 17. Cabin Kitchen Upgrade

    Oct 17, 2009 · 30m

    The Hometime crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures.

  18. 18. Vacation Home Laundry Room

    Oct 24, 2009 · 30m

    The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.

  19. 19. Historic Summer Home -- Structural Upgrades

    Oct 31, 2009 · 30m

    Dean, Miriam and the Hometime crew remove cabinets, asbestos flooring and a concrete slab then ingeniously reinforce sagging walls and pour a new concrete kitchen floor.

  20. 20. Historic Summer Home -- Kitchen

    Nov 7, 2009 · 30m

    Dean, Miriam and the Hometime crew rebuild old cabinets and install historically sensitive countertops, flooring, fixtures and appliances remodeling this 100-year-old kitchen.

  21. 21. Barrel Vault Basement

    Nov 14, 2009 · 30m

    The Hometime crew transforms a bland, unfinished basement by juggling doors and windows, repairing humps and cracks in the floor, and creating an arched ceiling.

  22. 22. Party Kitchen

    Nov 21, 2009 · 30m

    The Hometime crew puts in doors, tile and cabinets for the basement wet bar and peninsula.

  23. 23. Arched Wood Panels

    Nov 28, 2009 · 30m

    The Hometime crew puts in granite countertops and a trendy shower door then wrap up the custom wood paneling around a basement fireplace.

  24. 24. Attic Trusses

    Dec 5, 2009 · 30m

    The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage.

  25. 25. Standalone Garage

    Dec 12, 2009 · 30m

    The Hometime crew seals up the exterior of the garage and the new studio above it.

  26. 26. Yoga Studio

    Dec 19, 2009 · 30m

    The upstairs studio gets paint, flooring, and lighting. The downstairs garage gets flooring and cabinets.

Reviews

No reviews yet.