Season 23
Episodes
1. Digging Out the Yard
Feb 7, 2009 · 30m
The Hometime crew re-grades a sloping back yard, installs a drainage system, and begins building a series of paver patios.
2. Urban Terraces
Feb 14, 2009 · 30m
The Hometime crew weaves several retaining walls, steps, and patios into a small, sloped back yard.
3. Caretaker's Home
Feb 21, 2009 · 30m
The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.
4. Entrance Plaza
Mar 7, 2009 · 30m
The Hometime crew renovates a church courtyard with a textured concrete walkway, custom wood benches, and a raised planting bed.
5. Betsy-Tacy Home: Decoration
Apr 4, 2009 · 30m
The Hometime crew makes its last visit to this historic home to create a sidewalk outside and to finish painting and wallpapering the interior.
6. Eat-In-Kitchen: Demolition
Apr 11, 2009 · 30m
The Hometime crew takes a small kitchen and starts work to improve storage and functionality.
7. Eat-In-Kitchen: Cabinets
Apr 18, 2009 · 30m
The Hometime crew installs new kitchen cabinets, a new sliding door and new floor tile.
8. Eat-In-Kitchen: Wrap Up
Apr 25, 2009 · 30m
The Hometime crew installs countertops and appliances, as well as a new wood floor for the adjacent living room.
9. Sculpture Studio: Framing
May 2, 2009 · 30m
The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door.
10. Sculpture Studio: Finishing
May 9, 2009 · 30m
The Hometime crew wraps up the workshop with doors, windows and welding equipment.
11. Great Room Hardwood Floor
Sep 5, 2009 · 30m
The Hometime crew installs a super-hard, prefinished wood floor.
13. Seven-Year Plan
Sep 19, 2009 · 30m
The Hometime crew works with a designer to identify and prioritize a house-wide makeover. Then they begin with the first phase: tearing apart the living room and dining room.
14. Kitchen Facelift
Sep 26, 2009 · 30m
The Hometime crew transforms a kitchen with re-faced cabinets along with new counters, tile, appliances and lighting.
15. Great Room Update
Oct 3, 2009 · 30m
The Hometime crew uses new trim, wood flooring, lighting, paint and furniture to transform a dated, 1970s living room and dining room.
16. Linoleum Flooring
Oct 10, 2009 · 30m
The Hometime crew installs sheet and tile linoleum on the Hometime log cabin basement floor.
17. Cabin Kitchen Upgrade
Oct 17, 2009 · 30m
The Hometime crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures.
18. Vacation Home Laundry Room
Oct 24, 2009 · 30m
The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.
19. Historic Summer Home -- Structural Upgrades
Oct 31, 2009 · 30m
Dean, Miriam and the Hometime crew remove cabinets, asbestos flooring and a concrete slab then ingeniously reinforce sagging walls and pour a new concrete kitchen floor.
20. Historic Summer Home -- Kitchen
Nov 7, 2009 · 30m
Dean, Miriam and the Hometime crew rebuild old cabinets and install historically sensitive countertops, flooring, fixtures and appliances remodeling this 100-year-old kitchen.
21. Barrel Vault Basement
Nov 14, 2009 · 30m
The Hometime crew transforms a bland, unfinished basement by juggling doors and windows, repairing humps and cracks in the floor, and creating an arched ceiling.
22. Party Kitchen
Nov 21, 2009 · 30m
The Hometime crew puts in doors, tile and cabinets for the basement wet bar and peninsula.
23. Arched Wood Panels
Nov 28, 2009 · 30m
The Hometime crew puts in granite countertops and a trendy shower door then wrap up the custom wood paneling around a basement fireplace.
24. Attic Trusses
Dec 5, 2009 · 30m
The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage.
25. Standalone Garage
Dec 12, 2009 · 30m
The Hometime crew seals up the exterior of the garage and the new studio above it.
26. Yoga Studio
Dec 19, 2009 · 30m
The upstairs studio gets paint, flooring, and lighting. The downstairs garage gets flooring and cabinets.
Reviews
No reviews yet.