Skip to content
credits rolled
Sign in
Season 24

Season 24

201026 episodes13h in all

Episodes

  1. 1. Sculpture Studio Extension - Floor

    Feb 6, 2010 · 30m

    The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.

  2. 2. Sculpture Studio Extension - Walls

    Feb 13, 2010 · 30m

    The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.

  3. 3. Sculpture Studio Extension - Wrap Up

    Feb 20, 2010 · 30m

    The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.

  4. 4. Stone Cottage – Cul-De-Sac Prep

    Feb 27, 2010 · 30m

    The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.

  5. 5. Stone Cottage – Concrete & Foam

    Mar 6, 2010 · 30m

    The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.

  6. 6. Stone Cottage – Instant House

    Mar 13, 2010 · 30m

    The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.

  7. 7. Stone Cottage – Roofscape

    Mar 20, 2010 · 30m

    The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.

  8. 8. Stone Cottage – Windows

    Mar 27, 2010 · 30m

    The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.

  9. 9. Stone Cottage – Concrete Floors

    Apr 3, 2010 · 30m

    The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.

  10. 10. Stone Cottage – Inner Workings

    Apr 10, 2010 · 30m

    The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.

  11. 11. Stone Cottage – Insulation

    Apr 17, 2010 · 30m

    The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.

  12. 12. Stone Cottage – Geothermal

    Apr 24, 2010 · 30m

    The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.

  13. 13. His and Her Garage

    Sep 11, 2010 · 30m

    The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."

  14. 14. Stone Cottage -- Interior Walls

    Sep 18, 2010 · 30m

    After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.

  15. 15. Stone Cottage -- Vaulted Ceilings

    Sep 25, 2010 · 30m

    The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.

  16. 16. Stone Cottage -- Millwork

    Oct 2, 2010 · 30m

    Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.

  17. 17. Stone Cottage -- Exterior Doors

    Oct 9, 2010 · 30m

    The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.

  18. 18. Stone Cottage -- Tile

    Oct 16, 2010 · 30m

    The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.

  19. 19. Stone Cottage -- Driveway

    Oct 23, 2010 · 30m

    The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.

  20. 20. Stone Cottage -- Interior Doors

    Oct 30, 2010 · 30m

    The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.

  21. 21. Stone Cottage -- Laundry Room

    Nov 6, 2010 · 30m

    The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.

  22. 22. Stone Cottage -- Office

    Nov 13, 2010 · 30m

    The home office begins to take shape, as the custom staircase work begins.

  23. 23. Stone Cottage -- Countertops

    Nov 20, 2010 · 30m

    The stone countertops are fabricated and installed.

  24. 24. Stone Cottage -- Fixtures and Appliances

    Nov 27, 2010 · 30m

    The Hometime crew installs cabinets, countertops and landscaping.

  25. 25. Stone Cottage -- Retractable Screens

    Jan 22, 2011 · 30m

    The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.

  26. 26. Stone Cottage -- Sod and Stone

    Jan 29, 2011 · 30m

    The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.

Reviews

No reviews yet.